Unimportant Information You Need
Saturday, November 6, 2010
Wednesday, October 27, 2010
Process #005 FINAL
FINAL DESIGN PROCESS. THE OUTCOME OF MY POLYPROPYLENE CHAIR!!
THE TOP WAS DIFFICULT TO PATTERN THE OUTCOME WAS BEST APPROACHED BY RANDOMLY WEAVING IT THROUGH ON ALL THREE SIDES SEEMED TO CREATE A CONTRASTING THE PATTERNED SIDE.
Sunday, October 24, 2010
Process #004
STARTED STRAPPING OVER THE METAL FRAME.
CORNER MAY PROVE DIFFICULT BUT ONCE IT BUILDS UP IT MAY TURN OUT TO WORK.
MORE TESTING ON THE WAY.....
OVERALL!!!
Tuesday, October 19, 2010
Building Stage
WELDED SPOTS HAD TO BE CLEANED.
THREE MIDDLE SPOKES FOR THE LEGS ADDED FOR STABILITY IN THE FRAME.
ONCE WELDED HAD TO CLEAN THE JOINS WITH FILE.
SOME TOOLS I USED IN THE PROCESS OF BUILDING THE FRAME.
WELDER ON THE LEFT AND MY BENDING APPARATUS(RIGHT)
JOINING THE THE THREE SPOKES IN THE CENTRE AT THE TOP OF THE STOOL.
FOR RIGIDITY ADDED 45mm X 5mm LENGTH ROD JOINING ALL LEGS TOGETHER..
FRAME DONE. WOOP WOOP!!
Sunday, October 10, 2010
NGV VISIT!! DETAILING
SUSPENDED BY STRIPS TO GIVE THE IMPRESSION OF FLOATING. REALLY NICE WEAVED SHAPE.
TWO PART MOLD GLUED TOGETHER. LEGS TAPERED - AMAZING FEATURE AND WONDERFULLY BENT TO CREATE COOL LEGS
ALUMINIUM FRAME SUSPENDED ON BLACK FRAME. CAN BE SHIFTED TO CHANGE THE POSITION OF HOW YOU SIT IN THE CHAIR.
DETAIL - USE OF BUCKLE TO HOLD MATERIAL DOWN AND THE USE OF RODS TO SUSPEND. CONTINUOUS HOLES ON THE UNDERSIDE OF THE LEATHER.
Sunday, October 3, 2010
PHOTOS - BUILDING INITIAL FRAME
First Leg bent by measuring out then forging the corners around a metal bar before hammering the shape of the corner
More material is needed to make last leg but overall pretty good outcome.
Bars across the top of leg will have to be welded in to ensure the shape of the leg.
Subscribe to:
Posts (Atom)